DjezzyAlgeria · Telecommunications

Business Objects Architecture Upgrade

Stability, Scalability & Feature Enablement

Business problem
Rapid DWH rollout and hundreds of new reports destabilized BO
What BBI changed
Detailed review of BO server configurations to pinpoint the critical performance bottlenecks behind instability
Strongest supported result
9-Day DeliveryDelivery performance

Results

  • 9-Day DeliveryDelivery performance
  • Stable BO PlatformStated outcome
  • Advanced Features OnStated outcome
  • Hardened SecurityStated outcome

01Context

Djezzy is Algeria's leading mobile network operator, serving over 17 million subscribers with coverage exceeding 95%. Now part of VEON Group, Djezzy sought to stabilize its Business Objects environment, which had become unstable after hundreds of operational reports were deployed.

02Challenge

Before

  1. 01Rapid DWH rollout and hundreds of new reports destabilized BO
  2. 02architecture gaps threatened scalability
  3. 03advanced features were needed
  4. 04all within a nine-day window

After, as stated

  • 9-Day Delivery
  • Stable BO Platform
  • Advanced Features On
  • Hardened Security

03What BBI delivered

Stability, Scalability & Feature Enablement

  1. Environment Review

    Detailed review of BO server configurations to pinpoint the critical performance bottlenecks behind instability

  2. Load Balancer Tuning

    Optimized load balancer configurations to improve server efficiency and distribute report workloads

  3. Production Stabilization

    Resolved live production issues affecting environment stability as quick-win remediation

  4. Scalable Architecture

    Recommended long-term architectural changes to sustain scalability as reporting demand grows

  5. Features & Security

    Activated auditing and email notifications and strengthened the security matrix in line with best practice

  6. Optimization Roadmap

    Delivered a detailed environment review report with actionable insights and a roadmap for ongoing optimization

04Outcomes

Delivery performance

How the work was executed: timing, continuity and control.

  • 9-Day Delivery

Stated outcome

Listed as an outcome in the case study, without a figure.

  • Stable BO Platform
  • Advanced Features On
  • Hardened Security

05Technology & capabilities

Technology named in the case study

Capabilities

Numbers show how many of the 50 stories share each item.

Source notes
  • BBI Company Profile 2025 — case studies, slide 8. The deck classifies this story under “Telecommunications” and lists its location as “Algeria”.
  • Outcome labels are quoted from the case study. Their grouping (impact, scope, delivery, stated) is editorial.
  • The animation at the top of the page is an illustration, not a diagram of the client's systems.

→Contact BBI

Talk to BBI about your data and AI goals.

Contact form on bbi.ai
Head office
Office no 8 C6, I-Rise Tower, Barsha Heights, P.O. Box 119160, Dubai, UAE